top of page
Babson College
-
Asphalt walkways, approx. 250’
-
Removed existing asphalt, removed existing gravel
-
Realigned walkway paths
-
Installed new gravel
-
Installed new asphalt, approx. 50 tons
-
Removed existing granite steps
-
Removed all compromised concrete base
-
Repaired concrete base
-
Installed existing granite steps with new steel pins, approx. 36’ wide
-
Fabricated and installed new steel handrail
-
Removed existing asphalt curbing
-
Prepped area to receive new granite curbing
-
Installed new granite curbing, approx. 200’
-
Rebuild existing drain manhole with new frame and cover

New Asphalt Walkways

New Granite Steps

New Granite Curbing