top of page

Horn Pond Woburn, MA

Installed new cement concrete sidewalks, ADA/AAB-compliant pedestrian curb ramps, granite curbing, Rectangular Rapid Flashing Beacon (RRFB), new vehicle/bicycle pavement markings, traffic signage, loam & seed, and other incidental work as described herein. The project included pedestrian and bicycle modifications at two locations.

IMG_4170 (1).JPG
IMG_4180.JPG
IMG_4225.JPG

© 2025 by Commonwealth Construction & Consulting. Powered and secured by Wix

bottom of page