Chandler St. & Pleasant St. Tewksbury MA

The work included replacement of existing asphalt sidewalk and driveway aprons, installation of new granite curb, new 5-foot-wide asphalt sidewalk, accessible concrete ramps and
detectable warning panels, beacons and related line painting along approximately 2850 linear feet of roadway, also involved related work such as sawcutting of pavement, excavation, grading,
backfilling, compaction, pavement milling, limited roadway pavement and overlay, repair of asphalt berm, adjustment of roadway drainage, new leaching catch basins, adjustment of castings, gate boxes and
structures, loaming and seeding, dust control, erosion controls, wetland protection, traffic management.